Water-test support

Know the result
before the test.

A window that passed in a laboratory can still fail on a building. Most field failures come from how the window was installed and adjusted, not from the window. So we work on those things, on your site, before the testing agency arrives.

A field water test seen from inside the room: a wood and plastic test chamber sealed over an installed window, with water running down the outside of the glass
1234567
The window is the calm part. The seven numbers are all around it.
Why field tests fail

It is rarely the window.

The causes repeat from job to job. Every one of them is on the site, and every one can be found before the test. The numbers match the drawing.

  1. The installation did not follow the instructions, or the shop drawings were not used.
  2. The wrong sealant, or the right one applied the wrong way. Spray foam where a sealant was specified.
  3. An opening that was not waterproofed before the window went in, or shims in the wrong place.
  4. Screws driven through the weep holes.
  5. Clips or straps fitted incorrectly.
  6. The windows were never adjusted. An unadjusted window is not a finished installation.
  7. Jobsite debris left in or on the unit.
What we do, in order

From the drawings to test day.

01Every condition is drawn

The shop drawings are checked against the real conditions on your job, such as the trim at the sill, the brick returns and the sealant. They are approved with the architect, the engineer, the water consultant, the installer and the general contractor before anything is made.

02The instructions arrive first

At the start of the job the site receives a delivery guide, an installation guide, any instructions written for that project, and the shop drawings. A kick-off meeting with the general contractor and the installer goes through them.

03The crew is trained on this job

Our technician trains the crew on the conditions this building has: each kind of mullion join, field-applied nailing flanges, doors, the different sill depths, and how to adjust a window. Everyone who attends signs for it.

04A test prep kit

Adjustment tools, adjustment instructions and best practice for the test go to the job, at no additional cost.

A Vistaza window clamped into the factory test rig, its protective film still on, ready for the air and water test
A unit clamped into the test rig at the factory.
At the factory

The mock-up has a twin.

When a project calls for a mock-up, we build two. An identical unit is made alongside the one going to your site: the same specification, the same materials, the same production line, at the same time.

The twin stays at the factory and is tested there, to the same procedure your jobsite test will use and at a higher load. Whatever it shows is fixed and tested again until it passes, and the same fix is made to the unit on its way to you. If that unit has already shipped, the fix is written up step by step, with photographs, and carried out on site before the test.

A spray rack on a wooden stand in front of an installed window in a wall still wrapped in its blue weather barrier, with water running down the glass
A spray rack over an installed window. Water goes on the outside while the inside is watched.
The pre-test

We test it before they do.

Before a certified test our technician comes to the site, adjusts the windows, prepares them, and tests them with our own equipment. This is usually the day before. The closer to the test the better, because the longer the gap, the more can change on a site.

We do this for the mock-up, and again for the installed windows before each jobsite test. The aim is that the certified test confirms what we already know.

Test-ready

Four things, or the test should wait.

  • The windows are installed to the installation guide.
  • They have been adjusted and calibrated on site.
  • They are clean of jobsite debris.
  • We have had fourteen business days’ notice of the date.

The same list, with the numbers that matter on site, is on one page we send to the job: Before the water test.

We ask for fourteen business days’ notice of any test. With less than that we cannot promise that a technician is free.

A field water test seen from inside a building under construction: a window taped up for the test, one person standing watching it and a technician kneeling at the hose
Test day, from the inside. The window is taped up, water is on the outside, and everyone watches the inside.
Test day

Someone who knows the window is standing there.

An independent testing agency runs the test. We do not. Given notice, our technician attends, and makes any last-minute adjustments. There is no charge for attending.

If a unit does not pass, the technician can work on it there and then and have it tested again. That is only possible when somebody from the window company is on site.

Every result is recorded and the cause of any failure is identified. What one job teaches goes back into the installation instructions.

Where the line runs

We supply the windows. Your installer fits them.

We do not install the windows and we do not approve the installation. We train, we help, and we keep a record of both. The installer keeps responsibility for the work, and the quality of the installation stays with the project team.

The windows perform to their certified ratings only when they are installed to the instructions, adjusted on site after installation, and cleaned. We cannot guarantee a test result where that has not been done.

A water test on your schedule?

Tell us the date and send the window schedule.